Moving Tasks
What is this?
The Drag&Drop feature allows convenient management of tasks on the board by manually moving them between columns and groups.
How it works
You can drag tasks between columns to change their status (for example, from "To Do" to "In Progress").
Moving tasks between groups is also available if grouping is enabled (for example, between different projects or assignees).
If a column is based on a parameter with multiple possible values (such as several statuses, priorities, or projects), a selection window will open after dragging. There you can specify exactly which status (or other parameter) the task should be assigned to.